Multi-Utility Installation
What we offer
Accounts
Projects
SSL
SSL
SSL
SSL
SSL
Storage
Domains
Sub-domains
Your Text
DESIGN, CONSTRUCTION AND COMMISSIONING OF THE FOLLOWING
> New Low-Pressure Gas Mains
and Services
> Low Pressure Gas Meter Installations
> New Portable Water Mains
and Services
> Water Meter Installations
> New 11Kv (HV) Networks
> New LV Networks and Services
> 11Kv/LV Transformers and Substations
> Streetlighting
> Installation and Construction of Telecoms Ducts and Joints Boxes
> Temporary Water and Electric Building Supplies
PROJECT MANAGEMENT
> Disconnections of existing water, gas, electric mains and services
> Diversions and alterations of existing water, gas, electric mains and services
THE ABOVE ACTIONS ARE ONLY ABLE TO BE CARRIED OUT BY THE ASSET OWNERS. NATTA ARE ABLE TO ASSIST AND PROJECT MANAGE THESE WORKS ON BEHALF OF THE CLIENTS AS WELL AS CARRY OUT ANY CONTESTABLE WORK REQUIRED.
WHY CHOOSE US?
> Single point of contact for all utility installations
> Turnkey provider
> Integrated project management teams able to install all new utilities
> Cost and time saving for having a single company to undertake all of the works (utility and builders work)
> Reduce potential programme delays with earlier installation through turnkey management
> No client management required of contractor interfaces and removing surrounded risks such as waiting time, aborted site visits etc
> Investment in technology to improve safety, quality and productivity through the use of GPS positioning
Scope of works
SCOPE
SERVICES
MULTI-OCCUPANCY
METERING
MAINS
CABLE LAYING
CABLE JOINTING
SUBSTATION INSTALLATIONS
CIVILS
DESIGN
gas
New Services, Service Alterations and Service Disconnections
Natta will install internal or external manifold as required
All metering
New mains – any size
N/A
N/A
N/A
All civils works
Yes
water
New Services and Temporary Building Supplies
Natta will terminate the mains supply at Valve at the base of the internal riser
All metering
New mains – any size
N/A
N/A
N/A
All civils works
Yes
electricity
New HV & LV Mains, LV Services, Substation Installation
Temporary Building Supplies and Streetlighting
Natta will terminate the mains supply at Heavy Duty Cut Out at the base of the internal riser
N/A
N/A
New LV, 11kV, 33kV, 66kV & 132kV
LV Dead, LV, Live, Up to 11kV
Up To 20kV
All civils works
Yes