Menu
Multi-Utility Installation

Multi-Utility Installation

 

What we offer



Accounts

Projects

SSL

SSL

SSL

SSL

SSL

Storage

Domains

Sub-domains

Your Text

DESIGN, CONSTRUCTION AND COMMISSIONING OF THE FOLLOWING

GAS

> New Low-Pressure Gas Mains

and Services

Low Pressure Gas Meter Installations


New Portable Water Mains

and Services

Water Meter Installations

New 11Kv (HV) Networks

New LV Networks and Services

11Kv/LV Transformers and Substations

Streetlighting

Installation and Construction of Telecoms Ducts and Joints Boxes

Temporary Water and Electric Building Supplies


PROJECT MANAGEMENT

Disconnections of existing water, gas, electric mains and services


> Diversions and alterations of existing water, gas, electric mains and services






THE ABOVE ACTIONS ARE ONLY ABLE TO BE CARRIED OUT BY THE ASSET OWNERS. NATTA ARE ABLE TO ASSIST AND PROJECT MANAGE THESE WORKS ON BEHALF OF THE CLIENTS AS WELL AS CARRY OUT ANY CONTESTABLE WORK REQUIRED.





NATTA ARE A LLOYDS ACCREDITED MULTI-UTILITY INSTALLER FOR NEW GASWATER AND ELECTRIC NETWORKS


WHY CHOOSE US?

> Single point of contact for all utility installations


Turnkey provider


Integrated project management teams able to install all new utilities


Cost and time saving for having a single company to undertake all of the works (utility and builders work)


Reduce potential programme delays with earlier installation through turnkey management


No client management required of contractor interfaces and removing surrounded risks such as waiting time, aborted site visits etc


Investment in technology to improve safety, quality and productivity through the use of GPS positioning

 

Scope of works


SCOPE



SERVICES

MULTI-OCCUPANCY

METERING

MAINS

CABLE LAYING

CABLE JOINTING

SUBSTATION INSTALLATIONS

CIVILS

DESIGN

gas

New Services, Service Alterations and Service Disconnections

Natta will install internal or external manifold as required

All metering

New mains – any size

N/A

N/A

N/A

All civils works

Yes

water


New Services and Temporary Building Supplies

Natta will terminate the mains supply at Valve at the base of the internal riser

All metering

New mains – any size

N/A

N/A

N/A

All civils works

Yes

electricity

New HV & LV Mains, LV Services, Substation Installation

Temporary Building Supplies and Streetlighting

Natta will terminate the mains supply at Heavy Duty Cut Out at the base of the internal riser

N/A

N/A

New LV, 11kV, 33kV, 66kV & 132kV

LV Dead, LV, Live, Up to 11kV

Up To 20kV

All civils works

Yes