Maldon Crematorium









OVERVIEW
Natta was appointed to deliver the full infrastructure package required to enable the development of a new crematorium facility to serve Maldon and the surrounding areas. The works were critical in preparing the site for the construction of the crematorium building, and its associated amenities.SCOPE OF WORKS
Our scope included the construction of a new S278 access bellmouth, providing safe and direct entry to the site from the public road. It was delivered in compliance with local authority standards to ensure long-term durability and road safety. Within the site boundary, Natta constructed a new access road and car park to facilitate efficient traffic movement and provide adequate parking capacity for visitors and staff. These elements were built toaccommodate ceremonial vehicles and larger traffic volumes typically associated with such facilities.
Substructure works included the formation of reinforced concrete foundations for the new crematorium building and separate plant building. The project also encompassed comprehensive drainage works, including both foul and surface water management. Significant earthworks were undertaken to prepare and level the site. Additional responsibilities included BWIC, street lighting installations, and the coordination of works to integrate seamlessly with the crematorium construction.
This project demonstrates Natta’s expertise in delivering infrastructure schemes required for critical community facilities. Our ability to manage live interfaces and maintain quality and safety standards have ensured successful delivery on time and to specification.