Natta was appointed to deliver the construction and groundworks package for a new roundabout and access road at Dunsfold Airport, located in Cranleigh Surrey. These works formed a key component of the wider Dunsfold Park development.SCOPE OF WORKS
This project comprised the construction of a new roundabout and a primary access road, designed to serve as the grand entrance to the future development. These infrastructure works were critical in providing safe, direct and efficient access from the A281 into the main perimeter road within the Aerodrome site.The new access road was carefully planned to follow the alignment of the former runway, providing a wide avenue into the development. A key design consideration was the need to avoid disruption to local traffic during the works.
The project was further enhanced by extensive landscaping works, which introduced mature tree planting to frame the new road and roundabout. Large drainage swales were integrated to manage surface water, while wide shared use cycleways and footpaths were incorporated to support active travel and encourage pedestrian and cyclists within the site.
The combination of functional highway infrastructure, with aesthetically considered landscaping has resulted in a striking entrance to the development for the future phases of Dunsfold Park. This projects showcases Natta’s capability in delivering complex infrastructure works that combine engineering excellence and visual impact.

We hope this to be the first of many phases as the development is brought forward."