b'Dunsfold Airport SECTOR:OVERVIEW: Groundworks, 278 WorksNatta undertook the construction and groundworks for a new & Civil Engineeringroundabout and access road for Dunsfold Airport, in Cranleigh, Surrey. OUR ROLE:Main ContractorSCOPE OF WORKS:This project included the construction of a new roundabout and LOCATION:access road to serve as a grand entrance to the Dunsfold Park Cranleighdevelopment. CLIENT:The access road provides a direct link from the A281 to the main Perimeter Road within the Aerodrome site. This design ensured that Dunsfold Airport Ltdthere was minimum disruption of traffic to the local area.PROJECT VALUE:The road follows the line of the old runway and provides a wide 6mavenue into the development. Extensive landscaping with mature tree planting, large drainage DURATION:swales and wide cycleway footpaths were added to the projects 12 Monthsscale and introduced significant visual impact.See next page for more'