b'Project FactsOverview: Infrastructure and groundworks to a 108 housing unit residential Sector: Housingscheme.Our Role: Sub Contractor Scope of Works: Location: SurreyThe site is specified with a very high level of finishing incorporating granite Client: Crest Nicholson kerbs and paving.Project Value: 7.5m The project has required extensive co-ordination in maintaining the Duration: 24 months production on site, whilst not interfering with: filming at Longcross Studios, test driving at the race track and maintaining access to other tenants and new purchasers. Our scope is the entire groundworks and infrastructure up to and including ground floors. This encompasses all: roads, drainage, hard landscaping, vibro piling together with superstructure foundation, block work, beam and block floors.'