b'Project FactsOverview: As the main contractor, we are undertaking the enabling works Sector: Civil Engineering, Infrastructure and 278 Workson this project. Works include a new roundabout and access road to a new Industrial Park which will feature a drive-thru Our Role: Main Contractor Starbucks, Petrol station and commercial units. Location: Billingshurt, West SussexScope of Works:Client: Dunmoore Group Our scope includes the construction of a new on line roundabout with a Project Value: Circa 1.5mshort section of access road. The existing highway is to be kept open at all Duration: 6 monthstimes. Extensive resurfacing of the existing carriageway is to be undertaken and the installation of new street lighting and water mains (including diversions). An adoptable foul drainage diversion and storm attenuation tank are to be installed on site, as well as, potable water main and BT diversions.'