b'Redfields Garden Centre SECTOR:OVERVIEW: SuperstructureNatta were the principle contractor for the redevelopment of an existing garden centre site.OUR ROLE:SCOPE OF WORKS:Main ContractorThe works comprised the construction of a new 7000m garden centre in two phases ensuring constant trading from the existing LOCATION:and subsequent phase 1 store was maintained at all times. Church Crookham,Externally a new 278 roundabout and cycleway was constructed, Hampshiretogether with a 400 space car park. Extensive drainage measures were required involving large attenuation tanks, culverting CLIENT:of ditches and very large rainwater harvesting tanks. The building Redfields Gardenitself consisted of traditional foundations with concrete floor, steel Nursery Ltdframe and Kingspan cladding. Fit out was by the operator.PROJECT VALUE:The scheme required close liaison with statutory bodies, local 4mhighways, local residents and shoppers using the Garden Centre. Particular care was required with signage, access routes and DURATION:cleanliness due to a high proportion of elderly/disabled visitors to the store. 18 monthsWe maintained a high level of scoring by Considerate Contractors throughout the project.We were pleased to have been awarded subsequently a 9m project to construct 49 houses and flats as a turnkey project by the same client. See next page for more'