b'Avery Park Care Home SECTOR:OVERVIEW: Building, Care Homes Our Contract was the full design and build of a prestigious new 119 bed elderly care community. OUR ROLE:SCOPE OF WORKS: Main ContractorThis site provides a new 42 bedroom Dementia Care Home, a 77 bedroom Nursing Home and also included the conversion of the LOCATION:existing Victorian Villa to provide 8 Assisted Living Apartments, Kettering together with associated car parking.CLIENT:Natta Geo-Environmental Contracting were appointed to undertake Avery Healthcare extensive soil testing, ground analysis and the removal of all contaminated materials. PROJECT VALUE: 12.6mOur scope comprised of the entire design and build and the fit out works. This included all demolition, bulk excavation, associated DURATION:groundworks and substructure foundations. The works also included the construction of caltite retaining walls and hard 76 weekslandscapings.The method of construction was a structural steel frame, composite deck flooring and an external SFS wall build up with a facing brick finish. Internally the scheme included commercial kitchen and laundry, with numerous communal living areas, a cinema and spa facilities. See next page for more'