West Hill

Winchester
  • Winchester
  • Winchester
  • Winchester
  • Winchester

Project Facts

  • Sector:

    Civil Engineering, Infrastructure & 278 Works

  • Our Role:

    Sub Contractor

  • Location:

    Winchester

  • Client:

    Berkeley Group

  • Project Value:

    £6m

  • Duration:

    2 years

Overview:

The project consists of 6 apartment blocks varying from four to five storeys.

Scope of Works:

Three blocks are sat over one large linked reinforced concrete basement and podium slab with the main site road traversing the transfer deck.

A second block will also have a basement with the remaining two blocks commencing at ground level.

The project has 16 townhouses which will be built with internal half basements to utilise steep falls of the existing site.

Our scope is to carry out the initial site enabling works involving offsite drainage, 278 works and the installation of retaining/contiguous piled walls. The works also include the bulk excavation and removal of around 20,000m³ of soil, attenuation tanks, drainage, reinforced waterproof concrete basements and transition slabs.