Longcross Upper

Surrey
  • Longcross Upper
  • Longcross Upper
  • Longcross Upper
  • Longcross Upper
  • Longcross Upper

Project Facts

  • Sector:

    Civil Engineering, Groundworks, Infrastructure & 278 Works

  • Our Role:

    Sub Contractor

  • Location:

    Surrey

  • Client:

    Crest Nicholson

  • Project Value:

    £7.5m

  • Duration:

    24 months

Overview:

Infrastructure and groundworks to a 108 housing unit residential scheme.

Scope of Works:

The site is specified with a very high level of finishing incorporating granite kerbs and paving.

The project has required extensive co-ordination in maintaining the production on-site, whilst not interfering with: filming at Longcross Studios, test driving at the race track and maintaining access to other tenants and new purchasers.

Our scope is the entire groundworks and infrastructure up to and including ground floors. This encompasses all: roads, drainage, hard landscaping, vibro piling together with superstructure foundation, blockwork, beam and block floors.