Project Facts

  • Sector:

    Civil Engineering, Infrastructure & 278 Works

  • Our Role:

    Sub Contractor

  • Location:

    Arborfield

  • Client:

    Crest Nicholson

  • Project Value:

    £6m

  • Duration:

    20 months

Overview:

This project is for the groundworks and infrastructure to 110 houses at the former MOD Base at Arborfield.

Scope of Works:

We undertook the full build to DPC including CFA piled foundations, substructure blockwork and block and beam floors and issuing collateral warranties to the developer.

The aggressive build programme has entailed a workforce of some 50 operatives. They undertook the work on a number of different fronts at the same time.

As our extended remit, we acted as the principal contractor until the developer was able to take over.