modern thinking
traditional values

Athletes Olympic Village, Stratford

Project Facts
Our Role: Package Contractor
Location: Stratford, London
Client: Bovis Lend Lease
Project Value: £3 m
Duration: 6 months + 12 month maintenance period
Overview:
Working within a consortium to design and install the temporary utility services required to 15 new high rise apartment blocks and 2 large temporary welfare facilities, enabling construction of the Olympic village. Natta undertook the design of the temporary drainage including the economic and environmental solution of utilizing an on-site sewage treatment plant rather than removing all waste material off site. To facilitate the proposed designs Natta interfaced with various parties other than just the client including the EA, Network Rail (CTRL) and ARUP (permanent works design) to ensure all appropriate approvals were obtained.

"Natta played a major part in this project being successful and was an excellent part of the FES project team. Natta excelled with all construction works, and had excellent Health & Safety standards."

Scope of Works:

Natta was appointed as a package contractor for the above project. The works liaison with the EA to get any consents required. The installation of HV, LV. Water, CCTV, communications and street lighting. The installation of foul and surface water sewers, pumping station, silt attenuation ponds, sewage treatment plant, petrol interceptors and outfall.

PROJECT ACHIEVEMENTS

"Our imaginative approach to the drainage designed sewage treatment saved a million pounds from the budget, won us the job and delivered a fast track solution."

Matt Sainty Commercial Manager Natta
print