New 78 Unit Care Facility - Northampton

  • Healthcare_Northampton1
  • Healthcare_Northampton1
  • Healthcare_Northampton1
  • Healthcare_Northampton1
  • Healthcare_Northampton1
  • Healthcare_Northampton1
1 2 3 4 5 6
Project Facts
Sector: Healthcare
Our Role: Main Contractor
Location: Northampton
Client: Avery Healthcare
Project Value: £14.5 m
Duration: 102 weeks
Overview:
The project involves the full construction of 61 assisted apartments with 17 care bedrooms, with cinema, restaurant, bowling alley, hairdresser and spa.
Scope of Works:

The site is on a slope, and as such the building incorporates a semi-basement with waterproof concrete retaining walls cut into the ground, with then a 400 tonne steel frame structure punching off large reinforced pads to both lower and upper ground levels.

The four storey structure is clad in a mixture of brick, glass and metal with a flat roof. Internally the structure utilises a structural framing system, metalled floors with structural concrete topping, together with precast concrete stairs. Internally the apartments will be finished to a high standard with individual kitchenettes and bathrooms.

The scheme is visually impressive and we are very pleased to have the opportunity to be involved.

Our timelapse camera video below show the erection of the steel frame for the upper and lower levels.