The site had particular constraints working adjacent to the river Lea and retaining the existing highway which sat some 4 metres above river level.
The works were phased to quickly follow the demolition of the existing buildings and required close coordination with all of the stakeholders.
PROJECT ACHIEVEMENTS
"Natta took on a difficult site and built it with minimnum fuss to a very high standard and to an accelerated programmme."